Projects Requiring Designers
Visit the TBR RFPs and RFQs page for a listing of major projects with opportunities for design services.
If you are interested in a project listed below:
- Visit the website of the Office of State Architect to review the updated Designer Selection Process.
- Register with the Office of State Architect.
- Verify registration with the Secretary of State’s office if your business type requires filing.
- Download and save the April 2023
Designer Letter of Interest template
- Complete the document specifically for the project in which you have interest. The response is limited to FOUR pages.
- Save the document as a PDF with the following file convention: Institution-Project Title-Firm Name.pdf
- Send the completed Letter of Interest (in PDF format) to the email link in the list below
Projects Requiring Designers
Campus | Project | MACC | Date Added | Due | |
---|---|---|---|---|---|
Dyersburg SCC |
New Soccer Field Installation Create a new soccer field at the DSCC main campus in Dyersburg east of the existing softball field. Scope includes: Field grading and earthwork, drainage and irrigation systems, sod turf installation, electrical and data, perimeter fencing, goals, team benches, basic field accessories (poles/nets/goals), site cleanup and final preparation |
700,000 | 09-24-2025 | 10-15-2025 | |
Jackson SCC |
Student Center Updates Update and repair envelope and interior renovations. Work includes replacement of roofing system, replacing exterior facade, window replacement, architectural improvements, and interior improvements. |
3,025,000 | 09-30-2025 | 10-15-2025 | |
Southwest Tn CC |
Theatre Renovation Update and renovate the existing Union Avenue campus theatre |
435,000 | 09-30-2025 | 10-15-2025 | |
Motlow SCC |
Culinary Program Renovations This project will renovate the Forrester Building cafeteria at the Moore County Campus into a state-of-the-art instructional kitchen and classroom to support the new Culinary Program. The work includes demolition of outdated kitchen systems, reconfiguration of plumbing, electrical, HVAC, and utilities, installation of a new hood package and modern equipment, and upgrades to fire protection and health code compliance. The completed facility will provide a safe, functional, and high-quality teaching environment. |
2,530,000 | 10-01-2025 | 10-15-2025 |