If you are interested in a project listed below:

  1. Visit the website of the Office of State Architect to review the updated Designer Selection Process.
  2. Register with the Office of State Architect.
  3. Download and save the April 2015 revision of the File Designer Letter of Interest Form
  4. Complete the document specifically for the project in which you have interest.
  5. The response is limited to four pages (do not include photographs or attachments).
  6. Attach the completed Letter of Interest (in PDF format) to the appropriate email link in the list below.
  7. TBR requires a Designer Letter of Interest for Standard and Minor projects.

TBR Projects Needing Designers

CampusProjectMACCAddedDueE-Mail
Dyersburg SCCDoors and Hardware Updates
Replace metal outside doors, update campus key systems, and other related work.
275,00005-04-201705-23-2017Submit
Dyersburg SCCElevator Updates
Update equipment, controls and other requirements for two elevators.
312,00005-04-201705-23-2017Submit
StatewideEast Tennessee Architectural Consultant
Provide professional Architectural assistance regarding design, alteration, improvements, planning, repairs & maintenance, investigation, analysis. Architectural license is required. Initial contract will be $50,000. It is anticipated this will be a three year contract with renewal options.
50,00005-04-201705-23-2017Submit
StatewideGeotechnical Consultant
Provide professional Engineering assistance regarding design, alteration, improvements, planning, repairs & maintenance, investigation, analysis. Engineering license is required. Initial contract will be $50,000. It is anticipated this will be a three year contract with renewal options.
50,00005-04-201705-23-2017Submit
StatewideInterior Design Consultant
Provide professional Engineering assistance regarding design, alteration, improvements, planning, repairs & maintenance, investigation, analysis. Specific experience with preparing performance specifications and bidding furnishings is preferred. Interior design license is required. Initial contract will be $50,000. It is anticipated this will be a three year contract with renewal options.
50,00005-04-201705-23-2017Submit
StatewideMiddle Tennessee Architectural Consultant
Provide professional Architectural assistance regarding design, alteration, improvements, planning, repairs & maintenance, investigation, analysis. Architectural license is required. Initial contract will be $50,000. It is anticipated this will be a three year contract with renewal options.
50,00005-04-201705-23-2017Submit
StatewideMiddle Tennessee Engineering Consultant
Provide professional Engineering assistance regarding design, alteration, improvements, planning, repairs & maintenance, investigation, analysis. Engineering license is required. Initial contract will be $50,000. It is anticipated this will be a three year contract with renewal options.
50,00005-04-201705-23-2017Submit
Volunteer SCCCampus Underground Utility Upgrades
Replacement of underground utility lines and all related work. Primary focus is to enhance the reliability of the underground electrical service.
215,00005-04-201705-23-2017Submit
Cleveland SCCCental Plant Modernization
Replace or upgrade chillers, boilers, and HVAC equipment in various campus buildings.
682,50005-04-201705-24-2017Submit
Jackson SCCNelms Classroom HVAC Updates
Replace the HVAC system on the 3 levels of office space within the Nelms Classroom Building and add fresh air to meet standards. Experience evaluating and designing VRF systems is preferred.
533,00005-04-201705-24-2017Submit
Jackson SCCScience Building Roof Replacement
Replace the roof system on the Science Building.
335,00005-04-201705-24-2017Submit
MTSUElevator Modernization
Modernization of elevators in various buildings. Specific experience in elevator modernization projects is required.
625,00005-04-201705-24-2017Submit
Nashville SCCSidewalk and Lighting Improvements
Replace damaged and worn sidewalks. Replace parking lot sidewalk lights with better and more energy efficient LED lighting.
668,30005-04-201705-24-2017Submit
Roane SCCElectrical and Fire Suppression Upgrades
Upgrades to the electrical systems, including a generator and fire suppression system for the computer center.
465,00005-04-201705-24-2017Submit
Volunteer SCCParking, Road, and Site Upgrades
Repairs to parking lots, streets, sidewalks, including the addition of new sidewalks, signage, and lighting.
645,00005-04-201705-24-2017Submit
Walters SCCSeveral Buildings Roof Replacements
Replace roofs including all related work at multiple buildings.
575,00005-04-201705-24-2017Submit
Chattanooga SCCCETAS Building Roof Replacement
Replace the roof, gutters and downspouts and other related work on a major portion of the building.
1,292,50005-04-201705-25-2017Submit
Motlow SCCUnderground Utility Line Replacement
Repair or replace mechanical and electrical infrastructure systems serving the entire campus including boiler upgrades in the central plant.
1,050,00005-04-201705-25-2017Submit
MTSUKeathley University Center (KUC) Mechanical and HVAC Updates
Repair and replace mechanical, HVAC, and controls equipment, including associated electrical systems.
1,590,00005-04-201705-25-2017Submit
Nashville SCCAccess Control and Locking Updates
Install an access control system for all door and locks in classrooms, offices, conference rooms, and other entry points in all buildings on the main campus. Replace all manual key locks with card key fobs.
658,00005-04-201705-25-2017Submit
Northeast SCCLibrary and General Studies Roof Replacements
Replace roofs on the library and general studies buildings.
830,00005-04-201705-25-2017Submit
Southwest Tn CCMechanical Systems Updates
Replace air handling units, VAV boxes and upgrade system controls in multiple buildings.
1,125,00005-04-201705-25-2017Submit
StatewideADA Compliance
Update site and facilities to comply with the Americans with Disabilities Act and other disability-related issues. Three Designers will be selected for small projects (East, West, and Middle, TN.)
650,00005-04-201705-25-2017Submit
StatewideTCAT Building Systems Updates
Updates to building systems, interior and exterior doors, door hardware, exterior lighting, security cameras, mass notification, fire alarms and all related work. Two Designers will be selected for projects (East and Middle, TN.)
725,00005-04-201705-25-2017Submit
TSUBalcony Repairs
Repair balconies on Ford Residential Complex and New Housing Complex student apartment buildings, including floors, ceilings, framing, lighting, and stairwells.
330,00005-17-201705-25-2017Submit
APSUCentral Chiller Plant Repairs
Replace chillers, equipment and related infrastructure in the campus central heating and cooling plant.
1,650,00005-04-201705-29-2017Submit
APSURoof Replacements
Replace roofs and all related work for multiple campus buildings.
1,650,00005-04-201705-29-2017Submit
ETSUSafety and Structural Repairs
Repair the safety/structural issues on the east and west main entrances at Burgin Dossett. Repair the safety concerns at the entrances to Gilbreath Hall, Lamb Hall, Hutchinson, Memorial Center (east side), Burleson, Rogers Stout, Sam Wilson, Warf Pickel, and Nicks Hall. Also, structural repairs to exterior walls at Brown, Gilbreath, and Ball Halls.
2,200,00005-04-201705-29-2017Submit
MTSUAlarm System Updates
Upgrade fire alarm panels, devices & systems in Kirksey Old Main, Central Utility Plant, Honors Building, Todd, Alumni Memorial Gym and the Cope Administration Building.
2,585,00005-04-201705-29-2017Submit
MTSUPiping and Manhole Replacement
Replace steam and condensate piping and repair manholes.
1,730,00005-04-201705-29-2017Submit
MTSURoof Replacements
Replace roofs at several buildings campus-wide.
1,630,00005-04-201705-29-2017Submit
StatewideTCAT Parking and Paving Repairs Phase II
Replace or repair parking lots and sidewalks, including lighting and other related repairs. Two Designers will be selected for projects (West and East TN.)
2,200,00005-04-201705-29-2017Submit
StatewideTCAT Roof Replacements and Repairs Phase I and II
Roof repairs, replacements, and all related work. Two Designers will be selected for projects (West and Middle TN.)
1,870,00005-04-201705-29-2017Submit
Columbia SCCFinney Library Renovation
Renovate library and modernize study spaces, including technology upgrades. This project will include updates and replacements of key building components including HVAC, roof, elevator, restrooms, electrical distribution, life safety systems and exterior walkways and lighting.
4,950,00005-04-201705-30-2017Submit
ETSUCollege of Medicine Multi-Building HVAC and Controls Upgrades
Replace HVAC equipment and controls in multiple campus buildings including the hood and lab air controls in Building #178. Specific experience in laboratory renovation for rooms with hoods and individual laboratory control systems.
3,200,00005-04-201705-30-2017Submit
ETSUValleybrook Building Systems Replacement
Replacement of HVAC systems, including supporting electrical systems, controls, and all related work.
2,722,50005-04-201705-30-2017Submit
UoMRoof Replacements
Replace roofs including all related work at multiple buildings.
3,100,00005-04-201705-30-2017Submit
ETSUBaseball Hitting Facility
Construct a hitting facility with two tunnels, a bathroom, and a small locker room.
126,00005-17-201706-05-2017Submit
MTSUParking Services Facility
Construct a Parking Services Facility to include facilities for parking services, bus maintenance spaces, roadway, parking lot, and other related site improvements.
2,850,00005-17-201706-05-2017Submit
TSUGateway Entrance
Construction of a ceremonial gateway entrance to the main entry point of TSU on John Merritt Boulevard. Provide all utilities service required for lighting, electrical, data, gate operations, and security systems. Provide signage, road, hardscape, and landscape improvements as appropriate.
308,00005-17-201706-05-2017Submit
Volunteer SCCRamer Renovations
Renovate a portion of the Ramer Building. This project includes new spaces, finishes, HVAC, electrical, and plumbing work.
706,00005-17-201706-05-2017Submit
StatewideTCAT Improvements Phase II
Program expansion and improvements including minor enhancements in accordance with the TCAT Master Plan East Region. Projects may include new construction, major renovation or minor improvements at multiple Tennessee Colleges of Applied Technology locations in each of three regions.
12,000,00005-17-201706-06-2017Submit
StatewideTCAT Improvements Phase II
Program expansion and improvements including minor enhancements in accordance with the TCAT Master Plan Middle Region. Projects may include new construction, major renovation or minor improvements at multiple Tennessee Colleges of Applied Technology locations in each of three regions.
12,000,00005-17-201706-06-2017Submit
StatewideTCAT Improvements Phase II
Program expansion and improvements including minor enhancements in accordance with the TCAT Master Plan West Region. Projects may include new construction, major renovation or minor improvements at multiple Tennessee Colleges of Applied Technology locations in each of three regions.
12,000,00005-17-201706-06-2017Submit
ETSUSolar Panel Installation
Construct a photo voltaic energy system, including solar arrays, support structure, and electrical inverters.
175,00005-17-201706-08-2017Submit
UoMHVAC Replacements and Upgrades
Replacement of HVAC equipment, devices, controls and related components in multiple buildings.
8,200,00005-04-201706-08-2017Submit